Monterey Area River Restoration

Print

The City has established a Citizen Work Team to help guide the design process for the Monterey Area River Restoration.  The team will be working with the City’s consultant, Inter-fluve and staff to develop the detailed plans for the restoration work. The team’s efforts will be based on the restoration opportunities drawings that were developed during a community effort in late 2016 and early 2017. Those drawings can be viewed below.  

Following the community input process the river restoration plans will be finalized and construction documents will be developed for permitting and bidding purposes.  Restoration construction is anticipated to begin in mid to late 2018.

August 22, 2017 Community Engagement Forum Presentation 

Restoration Opportunities

Preliminary Design of Overall Restoration (also pictured below)

Preliminary Design of Dam Restoration

Preliminary Design of Downstream Restoration

Monterey Dam Restoration Design Overall2017-0207

 

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.